what is the heart of civil engineering

Answer Posted / ankit nigam

ventilation or windows

Is This Answer Correct ?    0 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice

2193


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

1567


Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method

1178


When was the first motorway built in england?

654


Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.

1625






Prepare a Schedule for a Highrised building from starting stage to Handover?

1502


what is cross hair cursor?

653


we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?

1919


At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.

1690


Explain what is 1/8 on the architect ruler denotes?

676


how i can tak Quantity of mortar in block work

1988


Explain the difference between shear and tensile strength.

667


specifications of fe500 steel

3051


what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet

1159


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1649