Answer Posted / santo.m.f
M25 test result at 7 days is of its 65%. ie; M25:-16.25 N/mm2. then 14 days 90%. ie; M25:- 22.5 n/mm2 .
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
why is the column design?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
material used for mendrel use to bend epoxy coated rebar
What is a bearing capacity of soil?
What are the ingredients of pre-stressed concrete?
Why are steel plates inserted inside bearings in elastomeric bearings?
List out some of the software program that can be useful for architect?
What is hybrid foundation?
explain the rale of the government in the construction industry
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
How much quantity of cement,sand,stone used to build 1 cum of cc road??
What is the difference between undo & redo?
How to plan a project