what are the checks to be performed while fixing a door and
a window frame..at site??

Answer Posted / tarun vashist

to check the door n
window is in soul.
to check hole pass is
fixed proper .n plaster
margin also take.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to do base isolation using ETABS software?

2483


how can we calculate steel value, depending on load

1695


Explain the various stages of the project planning process in construction?

704


what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain

1315


Why Is Propping Required For Long Structures Once The Form Work Is Removed?

696






whats is difference between anchorage length and development length

1374


How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete

1274


Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?

1381


how to calculate the strength of rebound hammer test reading in building construction ?

2882


Different sizes of Hollow blocks and its weight. Thanks.

1926


2nd and 4rt angle elevation used in which country ?

1837


if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix

1499


How to calculate quanty of steel in four leg stirrups?

1456


what is the exact dia of 8swg and 10swg gabion wire

1838


what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE

3599