how to calculate the quantity of plaster.
Answer Posted / ashis malakar
area x thickness of plaster = total quantity of plastering.
1m3 plaster = 2200 kg (weight of plaster)
taking proportion of cement and sand ,calculate the quantity
of materials .
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
what values & beliefs have guided you in your career path
How to calculate brick work quantity?? Block work quantity??
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
pls give me some basic informations in construction of a structure?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
sir how can we find the cement and sand required for making 4" drop
how to remove the quantity of metal 1 and metal 2 in concrete
How to find beam R/F cutting length
what is raft foundation
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
The mixture of different ingredients of cement is burnt at?
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.