what will be the cement and sand needed for 1sqm plastering ?
for ratio 1:6 and 10mm thick

Answer Posted / ashis malakar

(22x1)/7=3.14qm
(22x6)/7=18.85qm

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

in staad ,why we realease a moment of a member ? what is affect if we realease a moment

1727


What is rate for brick masonry work of 1.0 m3 in cm 1:6?

738


sir how can we find the cement and sand required for making 4" drop

1643


What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?

1973


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

1367






How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

1506


What is the difference between Fe 500, Fe 500 D and Fe 515.

3664


in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?

1561


Coverage of 25mm.thick ratio of 1:4 cement mortar?

1407


How much cum. Brick work can do by 1 madon

1183


How to determine thee cut length for steel reinforcement bars in R.C.C design

1059


LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.

1609


Can we apply curing compound on ceiling (slab Bottom)

362


how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches

1220


how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6

1018