what will be the cement and sand needed for 1sqm plastering ?
for ratio 1:6 and 10mm thick
Answer Posted / ashis malakar
(22x1)/7=3.14qm
(22x6)/7=18.85qm
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
Why should appointment store person for project ? what is the benefits for company ?
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
How much quantity of rod binding work by a rod binder per day
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
Define What is the meaning of a blue land surveyors flag?
Sir how to find cutting length for footing steel bars in the shape of "u"
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
Why Vitrified tile are getting pop up.
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
What are new methods /technologies of pothole patching?
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com