I have a 600VA UPS for computer only. It holds for
20minutes only.
1. Can it be upgraded for longer period.?
2. Can it be used for one ceiling fan and a tube light? If
yes, how to upgrade?
Answer Posted / rajat verma
There is something you can do, you have to purchase a battery charger for batteries of higher Ah ratings.
Then working with little circuits (relays ans transistors)(you have to do it yourself with a little internet help).
Now you can use external chargers for charging and discharge it using UPS. This extends the backup time, but computer UPS are not applicable to celling fans or so. TAKE CAUTIONS YOU MAY LOSE YOUR UPS IF NOT USED ON SPECIFICATION RATING).
THESE ARE VERY DELICATE MACHINES.
THANKYOU
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Which do you think is the most significant cause of energy loss in a factory?
WILL SCHNEIDER MAKE ACB(MASTERPACT)TRIP ON REVERSE POWER?
what are the stresses in circuit breakers ?
how we select ac fuse rating of an power inverter???
why asa method ZPF method is more accurate than ASA method?
To make a basic instrumentation amplifier, it takes A One op-amp with a certain feedback arrangement B Two op-amp and seven resistors C Three op-amps and seven capacitors D Three op-amps and seven resistors
Why synchronous motor is used in power factor improvement,dc series in lift
why transformer tank is in rectangular shape what happen when it is in step shape
What is nyquist contour?
what is the relative size of single and three phase?
Can Anyone suggest the Standards (IEC or IS) for selecting copper current density?
Is it possible to protect 3phase overload and earth fault of the 3phase system using two CT's.
how does the rotating m.m.f is produced in the 3-phase induction motor and how the poles are created in 3-phase induction motor ?
WHY IN AC DRIVES,INPUT PHASE CURRENT SHOW UNBALANCE?
Readings of ER300P Trivector meter