Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / sagar mistry
Here you have not given the column size.
So we assume column size 300mm X 300mm.
There is an Offset after the periphery of column & it is 75mm.
Rectangular Part
=L X B X H
=2 X 1.7 X 0.15
=0.51 cum
Trapezoidal Part
=(h/3)(A1 + A2 + SQRT ( A1 X A2 )
=((0.5-0.15)/3) ((2 X 1.7) + ((0.3+0.075)+(0.3+0.075)) + SQRT ((2 X 1.7) X ((0.3+0.075)+(0.3+0.075))
=0.12 ( 3.40 + 0.75 + 0.70 )
=0.57 cum
Total Concrete
=0.51 + 0.57
=1.08 cum
| Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
How to calculate carrying capacity of the existing water supply trunkmain
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
Slump Values for works?
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
is basic cost of the material includes tax?
Basic questions of civil engineering
What are the alternate material for steel, Sand and aggregate
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
what is m30 in concrete tiles
How do you calculate load bearing capacity of a waffle slab?
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
natucher of concrete &type of concrete?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
how to calculate the size of triangular ring in rcc column?
What are the advantages of building a dam on the river nile?