how to creat mix m-20? and how to check shuttering & how is
mark layout at open ground
Answer Posted / ratheesh
M20 = 1:1.5:3
shuttering
1. Slab & beam bottom level should be checked.
2. All props and bracing pipes should be checked,
3. Beam & Slab side alignment should be checked
4. side shuttering plump should be checked,
5. All room dimensions & Openings dimensions should be checked
6. before reinforcement should be apply shuttering oil.
Layout
you should be use pythagoras theorem...
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What are your future hopes for this job?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
The largest size of paper used in plotter to print the drawing made by Autocad .
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
Describe the advantages and disadvantages of using plastic and timber fenders?
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
Is there any course for billing available in Mumbai? If yes then please mail me the details..
at what pressure ply-wood is obtained by gluing wooden sheets
What is different between DI Pipe and CI pipe?
How much quantity of rod binding work by a rod binder per day