Answer Posted / m.senthilkumar
10mm
| Is This Answer Correct ? | 10 Yes | 11 No |
Post New Answer View All Answers
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
how much cost of single coat 20mm thick plastering per sqre meter
in the earthquqke the profile of water on dam is parabolic or not
What are the applications of the modulus of elasticity?
What is GSB gradation
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
What is the use of array command?
Why nautical mile is different from statute mile?
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
what is tension footing?
How will be cutting in timber plate size 600*400 column size
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?