Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

DEFINE M30 GRADE CONCRETE. FROM THIS
QUESTION WHAT; "M" & 30?

Answer Posted / t.balamurugesan

M is the mix..30 is the strength of the concrete cube after 28 days..

Is This Answer Correct ?    73 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is right & short method of measurement of slab&beam

2126


How is calculate the cube molt

2324


Which IS Code/American Code applied for coupler test of steel

2668


How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel

1907


how much of the strength comes from post-production curing

2821


how to workable concrete cube test M-25 design mix

3530


What are the composition of a landfill?

1314


what does the grad of cement shows (denotes)?

1679


why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure

1679


The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it

6228


i want texture painting pwd data

2127


from where ican get sample papers for CET-delhi 2012

2552


how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?

2126


can you give me the details of rate analysis of steel and concrete?

3042


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2502