1 fitter with 1 helper - 100 kg per day cutting, bending & placing,

Mason - 100 to 150 Sqft per day

Is This Answer Correct ?    91 Yes 23 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much need sand and cement for 1 cft roof construction?

3966


explain fie benefits of using standard terminology in the measurement process

1193


How do you calculate reinforcement weight of steel?

664


brickwork labour rate per cum ?

1107


what is the types of door's wood?

1586






do we decide reinforcement steel , based on bending moment ? give example with continous slab?

1947


how to compute slab reinforcements on step by step procedures??

4958


Define What is the difference between routing maintenance and major maintenance in school facilities?

741


find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.

1806


The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it

5551


How to make tiles floor step by step procedure?

1488


Explain soil analysis?

661


Please let me know what is the simplest way of Calculating Mix Designs

1516


Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?

663


Why you are leaving present job?

1599