what is the criteria for placing reinforcement in footing
and slabs e.g which span have to place first.
Answer Posted / md humayun
Long direction rod for footing.Short direction rod for slab.
| Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
In which code the the maximum height of concrete casting has been explained
What will you do if a portion of load bearing wall collapses under your supervision?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
How many Sft of Level Plaster per Kg
how do you calaculate the total steel quantity of an rcc building using thumb rule?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
What is costing in 100squre feet bricks
I what know about life time of frp tank plz explain about it specifications & other details
What do you meant by gui?
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
what r you reqired for concrete baching plant?