Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / r. suresh
Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will be
=H/3(A1+A2+sq root of A1+A2)
=((0.5-0.15)/3)(3.4+0.09+ Sq root of 3.4+0.09)
=0.621 Cum
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
What is specific gravity???
How to calculate quantity of plum masonry in 1:3:7
Why nautical mile is different from statute mile?
What do you meant by gui?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
What is the quantity of cement in mix m20 concrete?
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
five benefits of using standard terminology in the measurement process
What is GSB gradation
what is shuttering co efficient?
Define line type?
What are the basic use of runners and standards of pipelines?