Answer Posted / aarthi
its a soil name
Diablo clay, of 9 to 15 percent of slope
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
Whats the meanig of ,'K' VALUE in the case of soil.....
What materials were used to build the golden gate bridge?
how much shouid be the rate for ready mix concrete per cubic meter
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
What are the techniques to measure road difference?
What is labor and material payment bond?
What is min thickness,min grade of conc & age of PQC ?
What is limit state method and working stress method and ultimate method