Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / r. dilli babu
Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will be
=h/3(A1+A2+Sq root of A1square+A2square)
=((.5-.15)/3)(.09+3.4+(sq root of(.09 square + 3.4 square)))
=.116(3.49+(sq root of (11.5681))
=.116(3.49+3.401)
=.116*6.891
=.799 cum
| Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
in the earthquqke the profile of water on dam is parabolic or not
What is the significance of cost estimate knowledge for an architect?
how to conversation of all construction material in to brass
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
how to take concrete quantity for precast segment for viaduct project?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
How many pyramid in egypt?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
questions with answers to face an interview of an civil engineer regarding RCC buidings
Special thing in designing a overhead reservoir ? which is different from an ordinary design
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
why we can use dust in concrete insted of fly ash
what is the permanent solution applied for restoration of leaning tower of pisa?