what"s the formula find the cement consumption for brick work
23 thick wall 1 m3?

Answer Posted / muhammad saleem

20

Is This Answer Correct ?    7 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the per cu. mt. price of ready mix in Gujarat region.?

1781


How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?

1700


For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)

1519


How to calculate quanty of steel in four leg stirrups?

1453


Does VDF add strength to the flooring apart from preventing water ingress?

1059






how we calculate the grade of the Bituminous materials.?????

1823


There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?

964


Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.

1914


what is cross hair cursor?

643


why do we not deduct volume of steel to find actual volume of concrete in practical???

1322


Explain what are the phases inspections are done by local authority while construction?

739


What is progress payment?

704


What are some structures that may be subjected to fatigue?

655


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2390


How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?

4497