WHY SHOULD WE HIREYOU OVER THE OTHERS WAITING TO THE
INTERVIEW?
Answer Posted / v.rajesh
I can't say about others.As far as I am concerned ,I will
be honest to my work, second to none. I will put up all the
knowledge, skill and resources to accomplish whatever job
is entrusted to me.If this answer of mine suits your
organizational vision , then,I could be hired.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
How do you measure water flowing through 300mm diameter pipes?
why we are useing plastic under the lean concrete?and whts the advantage?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
Why Vitrified tile are getting pop up.
Use of coping on terrace wall and in 4" wall is compulsory or not ?
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
Whats the meanig of ,'K' VALUE in the case of soil.....
what is cement wastage percentage in NHAI ROAD WORKS
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
What are the materials used in building a gravity dam?
How to hide dimensions in autocad?
How much cement and sand required for 9"brick wall per square metre