Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why we ht line cable size small rather than lt cable.

Answer Posted / hemalatha

because HT Voltage having a high voltage & low current and
we are providing high insulation in bitwen of phases.LT
voltage is having low voltage & high current. we are
providing low insulation in bitwen of phases.current
depending of cross section of cable.More cross section more
electrons flow & less cross section less electrons flow.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is a vector protection in transformer

1964


i am going to attaned the engineer (disign)iterview at HAL please give me duid line

2236


What is the function of a neutral reactor.

1802


how to test the turn ratio of 3 phase transformer using volt meter shoe the curcit diagram.

2376


what is servo motor and how to work it.

1859


How to calculate Temp from Resister from PT100 equation,

1689


(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)

1797


how to calculate cable size in diffrent loads?

2015


Why we do 2 types of earthing on transformer (ie:)body earthing & neutral earthing , what is function. I am going to install a oo kva transformer & 380 kva dg set what should the earthing value?

1097


why we use four type of phase angle difference between pimary & secondry winding of a transformer & where we use them?

2030


After completing iti in electrician, how can i get certificate of electrical supervisor? What ia requirements. For it?

1763


What are the raitings of Mcb,mccb and Acb in detail ??

1559


explanation of mesh bus bars

2124


i need the curve duty cycle and amper for (150 kva @50% dyty cycle) transformer turn ratio :19 and vin 400

2059


why various test are performed on electrical panels & power cables before commissioning on site & what are these test???

1935