what is diffreant between the english
bond&flamish bond
Answer Posted / chetan
In English bond - every alternate coarse is header & stretcher and at the ends quarter brick is layed.
In Flemish bond - there is one stretcher & one header on one coarse and at the ends 3/4 bricks is placed
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
Describe the advantages and disadvantages of using plastic and timber fenders?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
residential buildings,mixing of concrete,structural,construction material,site handling.
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
In case if concrete box girder bridges how is the number of cells determined?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
how to calculate mivan shuttering matrial
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot