Answer Posted / james c
When installing instrumentation, cable is run from the marshelling cabinet, or some control system to the instrument in the field. The act of attaching the cables to the actual electrical terminals of the instrument or input output terminal at the Transmitting or receiving end is called Terminating the instrument. I.E instrument termination. Usually the instrument loop is installed in stages, where the instrument is physically mounted in the field, cable is pulled and run in cable trays or buried in trenches, and the ends of the cables are terminated.
Once prior to completely terminating a loop, the cable run is normally loop tested. I.e. Point to Point continuity checked. Once the cable is found to be good, and the instrument terminated, calibrated and tested to be functioning at the control system, the instrument is said to be commissioned. I.e ready for service. That is called commissioning. Usually commissioning forms a entire stage/phase of its own in a project.
| Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
Draw a group of instruments interlocked to a Pump & Motor?
what is installation and commissioning of (fat & sat) of power plant dcs ? this question keeps in desirable conditions of one company .
State some of balance principle’ advantages?
How to calibration a control valve?
In turbine what does term CDP, NI, NH, HSSOC means.
when a magnet is heated?
Calculate the maximum pressure drop that can be allowed to occur across a control valve, so that we can prevent cavitation / flashing from occurring. Use the following formula: Δ P allow = Km (P1 – PvapourA) where, Δ P allow - the maximum allowable differential pressure for sizing purposes, or terminal pressure drop; Km- the valve recovery coefficient from the manufacturer’s catalogue; P1 - absolute inlet fluid pressure; PvapourA - absolute fluid vapour pressure at the inlet temperature; Use Atmospheric pressure = 101.3 kPa, P1 = 1200 kPa(g), PvapourA = 4 kPa, KM = 0.72
How will you calibrate PID controller? explain with example.
Manipulation of dead wt. tester double piston type.
Can anybody please let me know Orifice plate sizing calculation formula and step by step procedure
What is super thermocoupal?
How can we test a bently nevda 3500/42M accelerometer monitor card by simulating it with test equipment?. what king od of signal (milli volts or volts or or resistance ) we should feed in the terminals of the card?
I am teja. I am studying Msc(tech) Electronics and Instrumentation (3years course) in Andhra university. But my course is not recognised by UGC and AICTE. Please tell me the job opportunities after this course. And i fineshed PLC course in IGIAT ,Vizag.Also complted my short term coure in SCADA, Seimans WinCC in ATI,Hyd.After Msc can i join Mtech for good job? or phd. How i can get good job in INdustrial Automation Side. Please give replay.Because this is my life matter.
How to erection of DCS Panel at site step by step
Why do we floating DC in DC system.