When installing instrumentation, cable is run from the marshelling cabinet, or some control system to the instrument in the field. The act of attaching the cables to the actual electrical terminals of the instrument or input output terminal at the Transmitting or receiving end is called Terminating the instrument. I.E instrument termination. Usually the instrument loop is installed in stages, where the instrument is physically mounted in the field, cable is pulled and run in cable trays or buried in trenches, and the ends of the cables are terminated.
Once prior to completely terminating a loop, the cable run is normally loop tested. I.e. Point to Point continuity checked. Once the cable is found to be good, and the instrument terminated, calibrated and tested to be functioning at the control system, the instrument is said to be commissioned. I.e ready for service. That is called commissioning. Usually commissioning forms a entire stage/phase of its own in a project.
| Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
How do you identify an orifice in the pipeline?
What is the use of each wire in three wire RTD
hi i am eswar i want to know the instrumentation interview questations for eil(engineers india ltd) i have applied for engineer post in eil please help in this.my mail id eswar310@gmail.com
What is cut off relay? And why use in PLC and DCS?
what is basic difference between motion balance and force balance in pneumatic instrument?
POSSITIVE PULSE IS APPLIED TO AN INVERTER INPUT.THE TIME FROM THE LEADING EDGE OF THE INPUT TO THE LEADING EDGE OF THE OUTPUT IS 10 ns. THE TIME FROM THE TRAILING EDGE OF THE INPUT TO THE TRYLING EDGE OF THE OUTPUT IS 8 ns. WHAT ARE THE VALUES OF tPLH and tPHL?
Which Signal hart communicator work? If there any signal change when hart connect while transmitter in line ?
god evening sir i am studying m.sc(tech)electronics &instrumention.am i elegible to all industies
What is hp & mp seperator .& what is its working principle ?
what is the minimum power (P=VI)to produce a spark?
Explain the mechanism behind the turbine meter.
when the instrument tapping on pipe line is located below and transmitter is located above the tapping point for liquid service transmitter, what should we do, is there any additional drain valve is required??
What is the exact differences between HART,FOUNDATION FIELDBUS,PROFIBUS?
State bernoulli’s application.
kindly sent some demo question and answer