Questions :-
HR-
Q.1 about yourself & family background ?
Q.2 Why u choose Power sector as ur carrier starting not any
other sector ??
Q. 3 What think abt NTPC ?
Techincal Questions:-
Q.1 about Vocational Training……What u did , see the main
equipments….etc
Q.2 Why a transformer Noise during its running condition ?
Q.3 about transformer oil material & Test name for the
measurement of its dielectric strength & wht will u do if
its dielectric strength goes low ? ……..some discussion type ?
Q.4 What is relation between transmission lines &
Communication lines ?
Q.5 Which Machine u will prefer to use at a place where
flammable gases are coming out & why ?
Q.6 how fault in an electric system is detected & hw
protection of equipments is done ?
Q.7 Why we didn’t feel electric shock in an electric train ??
Q.8 Anything u want to ask from us ??
Answer Posted / vikram
pls send all answer
mail is vkrm.singh099@gmail.com
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how did i get the competency certificate as electricle supervisor. iam completed my b.tech.but i dnt have any experince, this certificate is required for applyng ongc mangement trainees. what should i do sir please suggested me
WHAT ARE THE CHARACTERISTICS OF AN VOLTAG AMPLIFIER
why effective resistance should be more than static resistance in transmission line?
How to calculate Grid rotor resistance(GRR) losses in slip ring induction motor?
What are the characteristics of negative feedback?
In Electrical 'Single Line Diagram' cable nomenclature shows "2 X 1C X 630sq.mm to be provided for one incomer. The question is how many cable to be proved for one Incomer.
How do you select the pickup value of the relay?
Why frame of the motor is specified?. If we mention KW and voltage level,automatically frame is decided or separately frame is compulsory to mention?.
when will be the iocl interview results i faced interview on 8th september 2008 iam from electrical branch i faced interview for the post of electrical engineer??????????????????????//
Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT
What is an ac motor?
how is the incoming cable size calculated for a given current rating of a panel??
What is the formula formula for Busbar sizing and what are the things to be consider for Busbar Calculation?
If I want to replace a 26KW Slip ring Motor with a Squirrel Cage motor & Drive (for a Hoist Application). How can I approximate the Motor & Drive HP required in new Setup.
Why we used 690V in ACS 800 drives.Why dont use standard voltage like 415v or 1.1Kv