Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why IBD Vent is kept at higher elevation than CBD ?

Answer Posted / vinoth

when water is converted into steam, huge quantity of
dissolved salts are residues of this conversion. They
normally settle down in the bottom of the Boiler drum. In
CBD, we continuously remove this dissolved salts otherwise
it will get carry over with steam and damage the blades of
turbine. Where as IBD is to remove Excess feed water which
crosses the Seperator level inside the boiler drum.so IBD is
to prevent carry over water with steam where CBD is to
prevent carry over of scales with steam.
with above description, we can easily predict why IBD is
in higher elevated than CBD.

Is This Answer Correct ?    20 Yes 14 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is LB-SR.

3020


what's the moog valve

1518


How do you consider that you can improve and what assistance do you need to achieve this

1767


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1717


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2554


what is the basic use of power plant in equipment

1770


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

1007


what does mean by kva rating

1525


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

2421


what is the meaning of SST300 V56A in SIEMENS turbine

4371


By any way can we increase the B check hours from 300 to 500

2212


why airtel use + 24 volts and other operators use -48 volt

2635


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3264


why do you consider yourself a suitable candidate for this position

7461


What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?

2443