How to Concrete cube test method and required result in
3days & 7days & 28 days, for all grade of concrete which
refer the is code no.

Answer Posted / kalidas

Cube test will be done by compressive test machine &
the results contact me i will send

Is This Answer Correct ?    6 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is shuttering co efficient?

1303


how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.

1968


How do you change a dimension value in solidsworks?

779


what is the difference b/w full length and cutting length?

1810


Calculation of curtain wall of box culvert

5318






what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????

1662


Why should pumping be not used in case of concreting works?

997


what is the water cement ratio for plastering

1172


how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress

1382


std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30

1610


What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?

1854


What is the difference between yeild strength and compressive strength of steel???

1792


what is thumb rule for calculating the size of ISMB required for a particular length of span

2953


What is the exception critarea of cube?

1991


What is fineness modulus ? and its sieve # ?

712