how many covering can be taken in the beam,column & slab also
stair-case?
Answer Posted / lokesh jangid
beam-20 mm, slabs-20 mm, columns-40 mm, footing-50 mm, stair-20 mm
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
Define What are the uses of Groynes?
Define What is the distance between railway tracks?
Who designed the city of washington dc?
How to do rate analysis for concrete work including shuttering work?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
give me the rate analysis for Bituminous Macadam and SDBC
Types of column foundation and how to calculate its steel quantity.
What is Heavy Concrete & Normal Concrete
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
Explain creep?
What are the important hardware systems used for cad?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25