In Fe415 & Fe500,What is mean by "Fe" and "415/500"?
Answer Posted / prabhuling s. kalburgi
FE - indicates Ferrous.
415 / 500 indicates the Tensile strenth of the Steel.
For example - Fe415 steel will have a strenth of 415 N/ mm2
Is This Answer Correct ? | 99 Yes | 22 No |
Post New Answer View All Answers
What is progress payment?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
What is pre-stressed concrete?
What is the difference between a wood shake and wood shingles?
What are the advantages of cad software?
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
what is the weight of 12mm aggregates?
sir how can we find the cement and sand required for making 4" drop
Which are the top apps for you civil engineering?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What is semirigid connections?
What is the difference between Grade I, II and III of GSB?
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??