In Fe415 & Fe500,What is mean by "Fe" and "415/500"?

Answer Posted / prabhuling s. kalburgi

FE - indicates Ferrous.

415 / 500 indicates the Tensile strenth of the Steel.

For example - Fe415 steel will have a strenth of 415 N/ mm2

Is This Answer Correct ?    99 Yes 22 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is progress payment?

704


How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?

1531


What is pre-stressed concrete?

659


What is the difference between a wood shake and wood shingles?

697


What are the advantages of cad software?

653






how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high

1429


what is the weight of 12mm aggregates?

1089


sir how can we find the cement and sand required for making 4" drop

1641


Which are the top apps for you civil engineering?

680


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1272


What is semirigid connections?

1629


What is the difference between Grade I, II and III of GSB?

1894


i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI

1879


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

912


How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??

1593