How much snowcem required per sq. Meter area
Answer Posted / prabjeet singh
Depends upon the material quality and density of the material.
| Is This Answer Correct ? | 1 Yes | 6 No |
Post New Answer View All Answers
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
Define Workability ?
why we use aggregate,sand with cement in concrete?
What will you do if you encounter problems like accidents?
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
What is meant by scaffolding coefficient?
How many Sft of Level Plaster per Kg
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
How many feet are in 4 square yards?
How much quantity of rod binding work by a rod binder per day
what is the difference between natural draught cooling tower and induced draught cooling tower