Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

In turbine. why they not use 320
oil?

Answer Posted / k r kumar ranjan

In modern Steam turbine(say 600 MW) we use lube oil which having a ISO VG 32 grade,That means oil's kinematic viscosity is 32 centistoke,which have the ability to form hydrodynamic layer or wedge or film which acts as lubricating layer between shaft and journal bearing Babbitt material.As we know viscosity X Film velocity/Unit load= C(Bearing Characteristics number) which indicates whether there will be hydrodynamic lubrication or not.So for this reason generally grade-32 or 46 grade oils used not 320.

Is This Answer Correct ?    10 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why do you consider yourself a suitable candidate for this position

7505


procedure of how to generate power in solar plant.

2025


what is the basic use of power plant in equipment

1842


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

1047


what's the moog valve

1551


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2565


can dp type level transmitter work in under vaccum condition

2028


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

3467


What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?

2482


We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?

1974


operation

1968


explain how the third harmonic content of the magnetising current affects transformer design

3331


How do you consider that you can improve and what assistance do you need to achieve this

1797


what does mean by kva rating

1572


what is the difference between compensated & normal drum level in boiler drum?

1860