Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the diffrence between pelton and kaplan turbine

Answer Posted / surendra kumar

pelton wheel turbine is used for high head,& its specific speed very low 30-60 kaplan turbine is used for low head with high sp.speed 450 above

Is This Answer Correct ?    10 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much capacity of id fan for 200HP induction motor

1401


How much calorific value of heat is needed to heat 00c of

1894


how many types of suspensions are used in automobiles?

1039


QUSETION PAPERS SOLVED FOR THE LAST 4YEARS RRB EXAMS

2172


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1803


Explain the mechanical advantage of a double pulley?

1145


Is a diesel engines maximum rpm limited by the diesel burn rate?

1057


How pipe flanges are electrically insulated?

1054


What is the spinning jenny?

1048


Difference ISDN and Brodband?

1935


What does thermal diffusivity of metals signify.

1064


why we cant measure absolute entropy directly,but the change we can?

2328


what is the function of platern water wall in a boiler? and difference between with ordinary water wall?

2314


How do you find ductile-brittle transition temperature of metals?

1011


How a main gate (steel) get support from top whlie slides on the rail fixed on the bottom surface??

1871