what is the thickness mortar between two bricks

Answer Posted / sagar

15mm

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.

1790


What is Curtailing of R/F

1981


how to identify the failure of building by expansive soils

1226


I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

1651


why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?

10205






How to increase a bearing capacity of soil?

654


psc girder detail

2714


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

1886


What is the difference between routing maintenance and major maintenance in school facilities?

663


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1399


manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.

1650


What are the steps involved in the concreting process?

866


Explain major differences between routing maintenance and major maintenance.

656


Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

1305


How to arrive dry volume of concrete (1.52 to 1.57) ?

1900