How to calculate lap,bond and hook length for preparing bar
Bending schedule ?
Answer Posted / muthuraj s
it dedpend upon design basics please follwing SP34 & IS2502
| Is This Answer Correct ? | 28 Yes | 13 No |
Post New Answer View All Answers
What is Architect-Prepared Contract?
Explain the difference between shear and tensile strength.
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
What is fineness modulus ? and its sieve # ?
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
How to do base isolation for RC framed structure using ETABS software?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
Is there the dry coefficient of cement is constant?
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
How to calculate quanty of steel in four leg stirrups?
how to calculate rate analysys of 1:6 plastering 10 sq m