Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate lap,bond and hook length for preparing bar
Bending schedule ?

Answer Posted / muthuraj s

it dedpend upon design basics please follwing SP34 & IS2502

Is This Answer Correct ?    28 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is Architect-Prepared Contract?

1230


Explain the difference between shear and tensile strength.

1150


How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?

1807


What is fineness modulus ? and its sieve # ?

1464


Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct

1540


if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?

2856


How to do base isolation for RC framed structure using ETABS software?

4246


The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.

2779


A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L

2304


while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

1692


If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in

2060


Is there the dry coefficient of cement is constant?

2331


What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet

2575


How to calculate quanty of steel in four leg stirrups?

1986


how to calculate rate analysys of 1:6 plastering 10 sq m

3005