how many cubic feet in one unit of sand?

Answer Posted / subhash

100 cubic foot sand is one unit of sand

Is This Answer Correct ?    233 Yes 53 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.

1817


How to come 1.54 from dry to wet concrete? 

1808


what is polity

1642


how to take concrete quantity for precast segment for viaduct project?

2572


In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.

3530






What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.

1894


is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.

1909


How to estabilish reinforcement Steel rolling margin for a building projects ?

3638


column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial

3484


for pretensioning which will yield first and same for post tensioning?

1699


how do we design mix ratio?

1415


for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete

1470


For the construction project what capital cost has to be taken in consideration?

668


I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.

5553


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

909