Answer Posted / nitin
bar bending schedule is nothing but the required steel which is calculated in a format like sr.no,description of item,shape,size,no of item,no of bars,cutting length,unit wt.,total wt.
| Is This Answer Correct ? | 21 Yes | 5 No |
Post New Answer View All Answers
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
Differentiate orthographic and isometric projections?
Define What is the origin of name Railway Sleepers?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
questions with answers to face an interview of an civil engineer regarding RCC buidings
define the strength
Describe the advantages and disadvantages of using plastic and timber fenders?
Where is the worlds longest elevator and how long is it?
What is the difference between a wood shake and wood shingles?
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
What is reinforced concrete?
I am called for interview from north east power plant .so, I need some interview question which may help me.
Describe the sections included in a typical bill of quantities
Define What is the force exerted by the Tacoma narrows bridge?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.