Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / ashish parasiya
Question is not complete because one must require top are to calculate volume for trapezoid.
| Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
How much cement,sand,bricks and water needed for 1square metre brick work?
How to find the cuplock pipe qty in staging for Minor bridge?
what are the values of compressieve strenght?
where can i get the previous question papers for rrb section enginerr (civil)
what is moment-curvature relationship in semi rigid connections??
What is the tallest man made structure in the world?
What is M40 _ TOR - EQ and B.F.S
Ratio for 4500 psi concrete
what is idealized curve for concrere and steel
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
In cement making,what is meaning of blend,fineness,density.
How many litres of water used for curing of 1000sqft of slav
How to calculate plastering for elevated water storage tank
Formula for calculating the volume of bulb in underreamed pile