Post New Answer View All Answers
what is the water-cement ratio of mix design while 30mpa in 7 days?
The 4 main factors to start a construction project are––
The foundations are placed below ground level, to increase?
Define What is Civil Engineering?
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
Tell me about triple point of water.
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
When was the first motorway built in england?
How many types of slabs are there & how to design it?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
Which percentage of carpet area use in plot area of office building.
for pretensioning which will yield first and same for post tensioning?