What is OLTC in a transformer, specify its fuction.
Answer Posted / thapelo eric motsitsi
On Load tap Changers are most suitable
for Automatic Changing and can be
modified/Changing taps while its on
load/ Operating and can can be on either
Lv or Hv Depending on the Required load
Voltage.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How to address the servo drive for motor
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
How to calculate mf when meter equipment and meter are connected
how to calculate sizing of NGTR (Transformer rating,Loading resistor value and Current rating of resistor) and what is the X/R ratio. Details : 11kV,Capacitance 1.73532 micro farads,40kA for 1sec.
Hi guys! Plz help me to answer the following questions. 1. What are the types of transmission line energy losses? 2. Why are the VLF are used some types of services? 3. What frequencies are used for reliable beyond the horizon terrestrial communication without repeaters? 4. To permit selection of 1 out 16 equi-probable, what is the number of bitis required? 5. What is the most common modulation used for telegraphy? 6. What is the multiplexing is used to increase the capacity of the optic fiber? Thanks
I WANT BHEL PREVIOUS QUESTION
What is relation between transmission lines & Communication lines ?
How To Convert Apparent Into Real Power Without Knowing Reactive Power?
What is main cause of cable's terminal point burned in Lug on high temperature although lug and cable selection is ok as per stantard and also tightness is ok as per situation. so please take in deep and tell correct answer thanku.
how to calculate power consumption in slip ring motor at different step
when qty of cable being purchased is not sufficient according to the standard,what should the inspector do to ensure its quality according to the standard?
what will happens if one phase is missing for 33/11kv power transfomer and why?
how withstand of hi-pot test outputs of transformer wire 2.5mm
if a number of plc s are there then how many modbus to be used
what is the effect of higher value of GD???