while doing floring in a room,from where one can start
laying tiles.
Answer Posted / swati chandra
always start from the middle of the room or the land area.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
what is work of planning deptt. in any construction compny (in road project)
How to activate isometric axes in cad?
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
1m square 20mm plastering how much of water need curing work
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
how statics is different from dynamics
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
The concrete slump recommended for beams and slabs; is?
What is Architect-Prepared Contract?
how to caliculate required amount of cement and sand required for 1cu.m.
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,