while doing floring in a room,from where one can start
laying tiles.
Answer Posted / swati chandra
always start from the middle of the room or the land area.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
how to calculate testing date
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
Define What is aggregate?
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
about higyway engineering
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
trapozidal
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
i need gate exam civil engineering question papers with answers
how much cost of single coat 20mm thick plastering per sqre meter
Water filter calculation formula
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
What are new methods /technologies of pothole patching?
What are the materials used in building a gravity dam?