Answer Posted / guest
231
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
How do i right a ladder diagram that has 1 actuator that performs a full stroke followed by a half stroke
5- What is the task (function) of the excitation and isolation transformers in power plant? 6- What is the task (function) of LCI (A), LCI (B) and LCI (COS) in power plant? : LCI (A) and LCI(B) are load commutating inverter for generator turbine starting. , LCI (COS) is load commutating inverter change over switch
Is it required to do earthing in 2nd shop if earthed armoured cable is laid from 1st shop ?
If the feeder rating is 7.5 kw or 10 HP star-delta feeder, MCCB is taken as 63 a, contactors-32 a, how much will be the OLR rating or which range OLR should be considered when we concern about type-2 coordination?
The knee point of a current transformer is normally unique and known.So why in the nameplate of a CT they put the minimum value like this Vk> 400v.
HOW TO SET THE EARTH FAULT SETTINGS IN ACB????????????
how to calculate magnetic force genrated by a coil ?
if we have 320KVA Genset kindly advice how much load we can put it.
How would you calculate power loss in a resistor?
Why wind turbines wheels rotate constantly
what are the types of electromagnetic forces developed in practical transformer?
What is Bolted fault?
can i connect REF and Differencial relay in 1 CT core for transformer protection?
Q) Write VBscript code along with QTPscript code in QTP tool for below scenario 1. Launch yahoo site(i know) 2. Do loogin(i know) 3.Click inbox link(i know) 4.Go to every page of mail box and count no.of read mails and no.of unread mails(i know) 5.Store page numbers, read mail count and unread mail count in a new excel file sheet 6.Create 10 types of graphs on that data 7.Do logout and close site(i know) 8.Save new excel files with graph
Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir