why substation rating interms of 11 multiples???like
11kv/33kv iis there any special reason???
Answer Posted / satyendra bharati
Receiving end voltage is considered 10 percent more than
supply end voltage considering the loss will be 10
percent.so,10kv+10% is 11kv and30kv+10% is33 kv and60
kv+10% is66 kv and400 v+10% is440 volt and so on.
| Is This Answer Correct ? | 7 Yes | 3 No |
Post New Answer View All Answers
ht side line to earth voltage
how to test power transformer.YNd11
by using pump duty, how we will can calculate the motor duty(KW)? is there any standard or formula.
What is pd controller?
What is difference between YNyn0 and YNyn ??
Dear sir, iam completed iti ncvt electrician 2000-2002 & diploma electrical eng completed 2008-2010 distance education in rvd university, still i got B licences only but my working company want C licences, how to i get c licencese pls reply me iam in critical situation thank you karthick 9841637803
How to select circuit breakers rating eg. if i select a circuit breakers of capacity 40 amps DC with operating voltage 28 volts and if i what to use same circuit breakers for 300 Volts DC application what is the current rating of this circuit breakers.
Dear Mr B C pal...Can you plz. put some light on principle of operation of Z-Ct in conjunction to its use with 1Cx1000Sqmm HT Cables & Directional Ground Fault / Over Voltage Relays...Regd..Parag v K 9899115632
What are differences between Voltage, EMF & Potential difference ?
11000volt DG set carnt kaise banvay
What is the vector group of a transformer,how can it be found out?
can anybody send me syllabus of rrb section engg (electrical). and also send previous question pepar...
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
how many types control panel of a 132/33 kv substation
What is power relay?