How du we calculate dry cement (in Bags) for any concrete,
also sand and aggregate? How many bags of cement does 100
cft of concrete 1:2:4 require? Procedure to calculate the
required amount. Also if there is any easy thumb rule to
find out.
Answer Posted / muhammad younas
100*1.54=154 (1.54 for wet to dry)
1+2+4=7 (sum of ratio)
formula:
cement : (154*1)/7=22 cft = 22/1.25=17.60 Bags
sand : (154*2)/7=44 cft
aggregate: (154*4)/7=88 cft
Is This Answer Correct ? | 18 Yes | 2 No |
Post New Answer View All Answers
How to find out slope footing concrete
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
how calucate cement sand ratio for plstering
How do you calculate reinforcement weight of steel?
How to calculate woden area in sft and Cft
Whats the meanig of ,'K' VALUE in the case of soil.....
Why should you consider yourself fit to be hired by jindal steel.
What is thumb rule for deep trench excavation
Did any of the egyptian pyramids ever fall down?
What is the name of this multiplication factors ?
What is bylayer?
Explain the various stages of the project planning process in construction?
in design case of structural member best suitrable percentage of steel limit is what
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr