Answer Posted / sudin shaha
plum concrete is usually done where the surface is uneven and to minimise the costing of concrete.for eg. below footings of residencial bldgs where in a small portion where the slope of ground below single footing is 1:10 to 1:50 in that case to save the cost of concrete plum is usually preffered.This finally leads to minimise the construction cost of building in all.
Is This Answer Correct ? | 58 Yes | 8 No |
Post New Answer View All Answers
How do we determine the specific gravity of a cement?
What is structural frames or systems?
How can explode a block?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
Where will be the maximum bending moment in a TEE Beam?
what is the breaking strength of wall tiles
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
how to nfind out the specific gravity of sand.aggregate,water please help...
Define polar co ordinates.
to draw bm diagrams for portal frames under different loadings//
Explain what is zoning permit?
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
what is education Cess.
acceptance criteria for concrete works