Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

The difference between Centering & Shuttering is –––

Answer Posted / shashank

CENTRING AND SHUTTERING ARE ONE AND THE SAME , MOST OF THE
LOCAL CONTRACTOR USE CENTRING & THE CONSTRUCTION COMPANIES
USES THE WORD SHUTTERING INCLUDES FORM WORK STAGGING ETC

Is This Answer Correct ?    12 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)

2187


What is Gsb tollens ?

2005


What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet

2538


How many mortar required for Brickwork of 1 Cu.m works??

1522


what post do you prefer to work in this company and why do you think you can serve better in such position?

2822


150mm bricks size how many use 4.14 m3

1890


For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?

2217


How to calculate quanty of steel in four leg stirrups?

1938


What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code

2138


How much material is required for constructing a 2 Lane 2Km rigid pavement road

2189


How will you Engage Labours on Site?

1912


Did any of the egyptian pyramids ever fall down?

1207


acceptance criteria for concrete works

2201


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

2087


A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx

1817