The difference between Centering & Shuttering is –––
Answer Posted / shashank
CENTRING AND SHUTTERING ARE ONE AND THE SAME , MOST OF THE
LOCAL CONTRACTOR USE CENTRING & THE CONSTRUCTION COMPANIES
USES THE WORD SHUTTERING INCLUDES FORM WORK STAGGING ETC
| Is This Answer Correct ? | 12 Yes | 1 No |
Post New Answer View All Answers
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
What is Gsb tollens ?
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
How many mortar required for Brickwork of 1 Cu.m works??
what post do you prefer to work in this company and why do you think you can serve better in such position?
150mm bricks size how many use 4.14 m3
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
How to calculate quanty of steel in four leg stirrups?
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
How much material is required for constructing a 2 Lane 2Km rigid pavement road
How will you Engage Labours on Site?
Did any of the egyptian pyramids ever fall down?
acceptance criteria for concrete works
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx