how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.
Answer Posted / s jaikumar
For 1m3 of 1:1:2
Cement 1.5/4=0.375/0.036=10.41
Sand 0.37
Agg 2 *0.37 =0.74
So for 731cft /35.28=20.71
Cement is used 10.41*20.71=215.59 bags
Sand is used 0.37*20.71=7.66m3
Aggregates is used 0.74*20.71=15.32m3
Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
how to check and keep control on the wastage of material at site
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
how to calculate mivan shuttering matrial
What is absolute pressure? How absolute pressure is calculated?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
Pls explain me about tension and compression in a flat slab
Formula of area of crane hook
How to activate isometric axes in cad?
what is moment-curvature relationship in semi rigid connections??
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
how many minimum admixtures are used in water froofing structures
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What is passive earth pressure ?
Explain the advantages and disadvantages of using plastic and timber fenders?
Why reinforcement done in shorter span in two way slabs