The difference between Centering & Shuttering is –––
Answer Posted / s jaikumar
Centering is used for columns and shuttering is used for slabs and horizontal beams
| Is This Answer Correct ? | 0 Yes | 6 No |
Post New Answer View All Answers
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
Explain what are the skills required to become an architect?
What do we mean by partial moment release ??
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
Which is the direction of negative angle?
Define polar co ordinates.
What is componsation
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.