How many kilo of binding wire required for one ton of reinforcemet steel binding?
Answer Posted / jidin
10 kg
| Is This Answer Correct ? | 25 Yes | 4 No |
Post New Answer View All Answers
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
The 4 main factors to start a construction project are––
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
how i can tak Quantity of mortar in block work
TELL ME THE EQUATION FOR OGEE SPILLWAY
Why should pumping be not used in case of concreting works?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
how to check and keep control on the wastage of material at site
what mean By core Billing
Forces in a Shear Wall are in plane or out of plane ?
a butt weld is specified by
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
how to tie 10 legged stirrups