How to rectify thermal cracks (2mm wide, 9mm deep aprx. )
developed in tremix finished concrete floor?
Answer Posted / dnyanesh marne
By using GP2 rectify the thermal cracks.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is the per cu. mt. price of ready mix in Gujarat region.?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions
Describe the advantages and disadvantages of using plastic and timber fenders?
What is the difference between tor steel and tmt steel?
what is the maximum number of course that can be laid according to IS code and the max height.
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
rate analysis hiring of generator 62.5 KVA
rimmer in pile foundation
How foundation is designed, Column design and beam design
what"s the sort of beams?
What are the advantages and disadvantages of lead products in construction?
how to calculate steel for slab or footings?
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches