what is levelling staff least count

Answer Posted / amar kantak

0.1MM

Is This Answer Correct ?    8 Yes 26 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

1816


how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing

1832


why do we not deduct volume of steel to find actual volume of concrete in practical???

1329


The largest size of paper used in plotter to print the drawing made by Autocad .

1306


How can i do RCC rate analysis?

1251






What is meant by cad?

655


What do you mean by tolerance factor of concrete ?

2675


while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

1217


Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)

4557


how many types of survey and what are levelling instrument?

1561


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

2506


What are new methods /technologies of pothole patching?

1890


how many BSCs can i connect to the HUAWEI MSC

1842


Which brick is best for construction ,either fly ash or AAC BLOCKS

588


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

1833