Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to determine pile length and diameter of pile is there
any thumb rule?

Answer Posted / amar kantak

AS PER SOIL MECHANICS

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?

1983


What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??

2314


What are the uses of layer?

1228


How does siphoning work?

1325


What materials were used to build the golden gate bridge?

1246


how much cost of single coat 20mm thick plastering per sqre meter

1561


what will happen if one could not properly follow the spacing of slab reinforcement bar?

1988


What is the diameter of the 3"inch nails?

2007


What year was the keystone power plant in Indiana County constructed?

1101


How many % we consider for lap for reinforcement for estimates

1759


At what point does a circle start losing area when being flattened?

1055


pls give me ans to ACT formula cube testing porpuse

3002


In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?

2441


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1905


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2807