how to determine pile length and diameter of pile is there
any thumb rule?
Answer Posted / amar kantak
AS PER SOIL MECHANICS
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
What are the uses of layer?
How does siphoning work?
What materials were used to build the golden gate bridge?
how much cost of single coat 20mm thick plastering per sqre meter
what will happen if one could not properly follow the spacing of slab reinforcement bar?
What is the diameter of the 3"inch nails?
What year was the keystone power plant in Indiana County constructed?
How many % we consider for lap for reinforcement for estimates
At what point does a circle start losing area when being flattened?
pls give me ans to ACT formula cube testing porpuse
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?