what will happen if we pass electric current through rebars of
RCC Slab(is there any strength reduction of concrete during
this)??????????
Answer Posted / amar kantak
IT WILL INDUCE AN EMF AND THUS DRAW A MAGNETIC FIELD . THIS
WILL NOT ALLOW CONCRETE TO SETTLE .
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
how to design and calculate materail quantity for concrete speedbreaker ?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
The mixture of different ingredients of cement is burnt at?
what will be price of 1:2:4pcc per kg?
cement and sand required for one block of size 0.23*0.15*0.46
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
Does brick grows bigger every year?
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
why is M30 grade Concrete use for Foothing & Column M50
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.