how many cubic ft. for 50 kg ( 1 bag ) cement?
Answer Posted / sourav sanyal
unit weight of concrete = 1440kg/cubic meter
therefore unit weight is equal to weight over volume
given the unit weight already;
1440kg/cu.m = W/V
given also the weight of cement which is 50kg
so. cross multiply and we get
v= W/unit weight = 50/1440
and the answer is = 0.0347222 cu.m.
and 1 cu.m.=35.31 c.ft.
then .0347*35.31=1.225c.ft.
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
plz.show development and anchorage length in simple diagram.
can i get civil engineering test papers.......?????
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
I need to constructive work in amaraj batteries
VAT and CST ? Which benefits for buyer ? Why benefits?
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
what is the difference between replacement of cement by groundnut shell ash
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com