what is the salry which I am expect in kolkata for diploma
in civil engineer with 3 years 6 month exp.???
Answer Posted / pravin valand
20000 To 25000 RS.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is Curtailing of R/F
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
what is the difference between prime coat and tack coat in road construction
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
How to find beam R/F cutting length
How do you compute the volume of airflow?
What is the strength of 1:6:12 mix?
it is a corrected question." make a list of engineering property(properties) of soil.
What is the release of lien?
In Rcc ratio calculation I wanted to know quantity of Steel also.
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
How to marking the building